Enter each device's real power draw and UpsCalc adds it up, converts watts to apparent power at your power factor, applies peak headroom and recommends a standard UPS rating. The same page estimates battery backup time from capacity and inverter efficiency, plus monthly and yearly electricity cost and CO2 for that load.

In one line: UpsCalc is a free UPS and home lab power calculator that runs only in your browser. The device list you type is never sent anywhere.

  • 3calculators (size, runtime, cost)
  • 0.5–1.0power factor range
  • 20guides (4 languages)
  • 0uploads

UPS sizing (VA ↔ W)

Add up the real watts each device draws, divide by the power factor to get apparent power in VA, then add peak headroom to reach a design load. Enter your UPS rating to see the load ratio and whether it would be overloaded.

128 W

Presets

Device list

DeviceWattsQtySubtotal (W)
40
12
15
45
16

Sizing result

Total real power128 W
Total apparent power182.9 VA
Design size (with headroom)228.6 VA
Design real load160 W
Recommended standard rating350 VA
Load ratio (VA / W)36.6% / 28.4%
VerdictComfortable

A 40–70% load ratio is the sweet spot. Above 85% runtime collapses during an outage, and above 100% the UPS may cut off immediately.

Real load margin at that rating: 322 W

Battery backup runtime

Battery capacity, voltage and series/parallel layout, inverter efficiency, usable depth of discharge and aging all change the answer. Turn on Peukert correction to model the capacity lost at high discharge currents.

Peukert correction
Battery energy2,400 Wh
Usable energy1,536 Wh
DC discharge current7.82 A
Estimated backup time7h 9min
Battery capacity needed9.9 Ah

Method comparison

MethodMinutesHours
Linear energy method5228h 42min
Peukert corrected4297h 9min

Assumptions and limits

  • The Peukert exponent defaults to 1.15 for VRLA and AGM, around 1.05 for LiFePO4. An exponent of 1 means an ideal battery with no capacity loss at high current.
  • The constant power model derives current from an average discharge voltage of 94% of nominal. A real inverter pulls more current as voltage sags, so runtime can come out shorter than calculated.
  • Usable depth and aging are applied multiplicatively to the 20-hour rated capacity. Lithium is typically 80–90% usable, lead-acid around 50%.
  • No temperature correction is applied. Capacity falls below 25°C (roughly −10 to −20% at 0°C) and heat shortens life.
  • Manufacturer runtime charts are measured on new batteries at 25°C with a fixed load and a defined cutoff, so a 10–30% difference from this estimate is normal.

Electricity cost and carbon estimate

Average watts and daily hours give daily, monthly and yearly energy. A tariff and emission factor turn that into cost and CO2. The Korea mode applies the three residential tiers with base charge, VAT and the industry fund.

Daily energy3.07 kWh
Monthly energy93.51 kWh
Yearly energy1,121.28 kWh
Monthly cost₩14,685
Yearly cost₩176,226
Monthly CO242.9 kg
Yearly CO2514.7 kg

Korea tier breakdown

TierEnergyEnergy charge
Tier 1: 0–200 kWh93.51 kWh₩11,221
Tier 2: 201–400 kWh0.00 kWh₩0
Tier 3: over 400 kWh0.00 kWh₩0

Estimate includes 10% VAT, the 3.7% industry fund and the 9 KRW/kWh climate charge. Real bills vary with season, the summer/winter super-user rate, welfare discounts and contract class.

Emission factors differ by year and agency. Defaults are 459 for Korea, 434 for Japan, 371 for the United States and 495 gCO2/kWh for Taiwan, all editable.

Export

Copy or download the device list and all three results as CSV or Markdown. Everything is generated in the browser and nothing is uploaded.

Preview

section,label,qty,value,unit
device,NAS,1,40,W
device,Router,1,12,W
device,Switch,1,15,W
device,Mini PC,1,45,W
device,HDD,2,16,W
sizing,total_w,,128,W
sizing,load_va,,182.9,VA
sizing,design_va,,228.6,VA
sizing,design_w,,160,W
sizing,recommended_va,,350,VA
sizing,load_ratio,,36.6,%
runtime,battery_wh,,2400,Wh
runtime,usable_wh,,1536,Wh
runtime,dc_current,,7.82,A
runtime,runtime_min,,429,min
runtime,target_min,,30,min
cost,daily_kwh,,3.07,kWh
cost,monthly_kwh,,93.51,kWh
cost,yearly_kwh,,1121.28,kWh
cost,monthly_cost,,14685,KR
cost,yearly_cost,,176226,KR
cost,monthly_co2,,42.92,kg
cost,yearly_co2,,514.67,kg

How it works

Every calculation finishes inside the browser, and every assumption is written on the page and in the guides.

Enter devicesAdd each NAS, router or server with its real watt draw, or start from a preset. Quantity multiplies the load.
Apply PF and headroomDivide total watts by the power factor to get VA, then add 20–30% peak headroom for the design size.
Estimate runtimeCapacity, voltage, series/parallel layout, efficiency, depth of discharge and the Peukert exponent give backup time.
Cost and exportTurn the same load into monthly and yearly cost and CO2, then copy or download it as CSV or Markdown.

Frequently asked questions

Should I choose a UPS by VA or by watts?

Look at both. A UPS has a VA ceiling and a watt ceiling, and modern units are usually rated at an output power factor of 0.9 to 1.0. A load with a low power factor needs more VA for the same watts, so picking on VA alone can leave you over the watt limit.

Why do power factor values range from 0.6 to 0.9?

It depends on the load. Cheap adapters without power factor correction sit at 0.5–0.6, ordinary ATX supplies at 0.6–0.7, and active-PFC supplies at 0.9–0.99. Use the nameplate or a PDU measurement when you have it; if not, assume 0.7 and keep more headroom.

How much peak headroom should I leave?

20–30% is typical. If you have repeated short peaks such as drive spin-up, GPU boost or PoE camera boot, go to 30%. Too much headroom (below a 20% load ratio) hurts efficiency and battery life.

Why is the calculated runtime shorter than the vendor chart?

Vendor charts are measured on a new battery at 25°C, often at 50% load, down to a specified cutoff voltage. Aging, low temperature, a high load ratio and inverter losses easily remove 10–30%. A battery older than three years may hold only 60–70% of its rated capacity.

What is the difference between constant power and constant current discharge?

An inverter keeps drawing the same watts as voltage falls, so current rises: that is constant power. A pure resistive load draws current in proportion to voltage: that is constant current. Constant power averages a higher current and therefore a shorter runtime.

How accurate is the Korean electricity bill estimate?

It applies the three residential low-voltage tiers, the base charge, a 9 KRW/kWh climate charge, 10% VAT and the 3.7% industry fund. It does not model the summer/winter super-user rate above 450 kWh, welfare discounts or commercial contract classes, so a real bill can differ by a few thousand won.

Is my device list uploaded anywhere?

No. Everything runs inside your browser, with no server, API or account. Inputs stay in this device's localStorage only, and clearing site data removes them.

UPS and home lab power guides